Need another room
and have an unused cellar? Then this is your answer. |
|
| BEFORE |
|

|
1. Damp
cellar. |
|
| DURING |
|

|
2.
Cavity membrane and drainage system being installed. |
|
|

|
3.
Concrete base has been laid level with the drainage system and the
cavity drain membrane is being affixed to the floor. |
|
|

|
4.
Timber battens being affixed to the walls ready for the
plasterboard. |
|
|

|
5. Chipboard floor is
being laid and plaster board affixed to the walls. |
|
| AFTER |
|

|
6. Walls &
ceiling plastered and skirting fixed. |
|
|
|

|
7. Stairs up to Velux
window. (For emergency escape). |
|
|
|

|
8. External Velux
window. |
|
|
|
This shows you
what can be done with your unused cellar. Contact us for details. |
|